Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.
Component Testing Requirements at Nuclear Facilities
Name übersetzen
NORM herausgegeben am 2024
Bezeichnung normen: ASME OM-2:2024
Ausgabedatum normen: 2024
SKU: NS-1206348
Zahl der Seiten: 83
Gewicht ca.: 280 g (0.62 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASME
Inservice testing (IST) is used at nuclear facilities to examine, test, and monitor pumps, valves, and dynamic restraint devices. ASME OM-2, Component Testing Requirements at Nuclear Facilities, is a component code intended to be used for IST at nuclear facilities of various designs. ASME OM, Operation and Maintenance of Nuclear Power Plants, provides requirements for the performance of IST at water-cooled nuclear power plants. The purpose of IST is to test, examine, and monitor pumps, valves, and dynamic restraint devices to ensure the operational readiness of the component to perform its specified functions. Both ASME OM and ASME OM-2 accomplish this by trending degradation so that such degradation can be detected and remedied prior to the component being incapable of performing its specified functions. ASME prepared ASME OM specifically for light water reactors (LWRs). Additionally, ASME made several accommodations in ASME OM in the testing of components because many components cannot be fully tested with the nuclear power plant online. A reason for this is that ASME prepared ASME OM after many of those plants were built and operating. With the expansion and evolution of the nuclear industry to facilities that are significantly different than the currently operating LWRs, ASME recognized that another code, ASME OM-2, for IST of components in new and advanced reactors was needed. ASME designed ASME OM-2 with the basic prerequisite that components that are to be part of the IST program for these new facilities are appropriate for the functions that they are to provide, that they are correctly sized and specified for the parameters of the system in which they are to be installed and operating, and that the materials of their construction are compatible with the system fluid conditions, pressures, temperature, and chemistry.
Bereitstellung von aktuellen Informationen über legislative Vorschriften in der Sammlung der Gesetze bis zum Jahr 1945.
Aktualisierung 2x pro Monat!
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2025-01-10 (Zahl der Positionen: 2 218 439)
© Copyright 2025 NORMSERVIS s.r.o.