Wir benötigen Ihre Einwilligung zur Verwendung der einzelnen Daten, damit Sie unter anderem Informationen zu Ihren Interessen einsehen können. Klicken Sie auf "OK", um Ihre Zustimmung zu erteilen.
Standard Practice for Sampling Aggregates
Automatische name übersetzung:
Standard Praxis für Sampling Aggregates
NORM herausgegeben am 10.7.2003
Bezeichnung normen: ASTM D75-03
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 10.7.2003
SKU: NS-38608
Zahl der Seiten: 5
Gewicht ca.: 15 g (0.03 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
aggregates, exploration of potential sources, aggregates, number of sizes needed to estimate character, aggregates, sampling, ICS Number Code 91.100.30 (Concrete and concrete products)
Significance and Use | ||||||||||||||||
Sampling is equally as important as the testing, and the sampler shall use every precaution to obtain samples that will show the nature and condition of the materials which they represent. Samples for preliminary investigation tests are obtained by the party responsible for development of the potential source (Note 2). Samples of materials for control of the production at the source or control of the work at the site of use are obtained by the manufacturer, contractor, or other parties responsible for accomplishing the work. Samples for tests to be used in acceptance or rejection decisions by the purchaser are obtained by the purchaser or his authorized representative. Note 2—The preliminary investigation and sampling of potential aggregate sources and types occupies a very important place in determining the availability and suitability of the largest single constituent entering into the construction. It influences the type of construction from the standpoint of economics and governs the necessary material control to ensure durability of the resulting structure, from the aggregate standpoint. This investigation should be done only by a responsible trained and experienced person. For more comprehensive guidance, see the Appendix. |
||||||||||||||||
1. Scope | ||||||||||||||||
1.1 This practice covers sampling of coarse and fine aggregates for the following purposes: 1.1.1 Preliminary investigation of the potential source of supply, 1.1.2 Control of the product at the source of supply, 1.1.3 Control of the operations at the site of use, and 1.1.4 Acceptance or rejection of the materials. Note 1— Sampling plans and acceptance and control tests vary with the type of construction in which the material is used. Attention is directed to Practices E 105 and D 3665. 1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use. |
||||||||||||||||
2. Referenced Documents | ||||||||||||||||
|
Bereitstellung von aktuellen Informationen über legislative Vorschriften in der Sammlung der Gesetze bis zum Jahr 1945.
Aktualisierung 2x pro Monat!
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-12-21 (Zahl der Positionen: 2 216 840)
© Copyright 2024 NORMSERVIS s.r.o.