Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Thermosetting Resin Pipe (CIPP)
Automatische name übersetzung:
Standard Praxis für die Rehabilitation von bestehenden Rohrleitungen und Leitungen durch die in Platz Installation von glasfaserverstärktem Kunststoff (GFK) Gehärtete-in-Place duroplastischen Harz Rohr gezogen (CIPP)
NORM herausgegeben am 1.9.2011
Bezeichnung normen: ASTM F2019-11
Anmerkung: UNGÜLTIG
Ausgabedatum normen: 1.9.2011
SKU: NS-52466
Zahl der Seiten: 9
Gewicht ca.: 27 g (0.06 Pfund)
Land: Amerikanische technische Norm
Kategorie: Technische Normen ASTM
Keywords:
cured-in-place pipe (CIPP), glass reinforced plastic (GRP), rehabilitation, steam cured, UV-cured, UV-light-cured: Conduits, Curing (in pipeline/conduit rehabilitation), Glass-fiber-reinforced (GRP) plastics, Installation--plastic pipe materials/applications, Pulled-in-place installation (of pipelines), Rehabilitation--sewerlines, ICS Number Code 23.040.20 (Plastic pipes)
Significance and Use | ||||||||||||||||||||||||||
This practice is for use by designers and specifiers, regulatory agencies, owners and inspection organizations who are involved in the rehabilitation of conduits through the use of a resin-impregnated fabric tube, pulled in place through an existing conduit and subsequently inflated and cured. As for any standard practice, modifications may be required for specific job conditions. |
||||||||||||||||||||||||||
1. Scope | ||||||||||||||||||||||||||
1.1 This practice covers the procedures for the reconstruction of pipelines and conduits (4 to 60 in. (100 to 1500 mm) diameter) by the pulled-in place installation of a resin-impregnated, flexible fabric tube into an existing conduit followed by inflation with compressed air (see Fig. 1). The resin/fabric tube can be cured by either the flow through the fabric tube of mixed air and steam or hot water or by use of ultraviolet light. When cured, the finished cured-in-place pipe will be continuous and tight fitting. This reconstruction process can be used in a variety of gravity flow applications such as sanitary sewers, storm sewers, process piping, electrical conduits, ventilation systems, and pressure applications. 1.2 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard. 1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
|
||||||||||||||||||||||||||
2. Referenced Documents | ||||||||||||||||||||||||||
|
Historisch
1.8.2013
Historisch
1.2.2007
Historisch
15.11.2009
Historisch
1.11.2012
Historisch
1.8.2013
Historisch
1.8.2011
Wollen Sie sich sicher sein, dass Sie nur die gültigen technischen Normen verwenden?
Wir bieten Ihnen eine Lösung, die Ihnen eine Monatsübersicht über die Aktualität der von Ihnen angewandten Normen sicher stellt.
Brauchen Sie mehr Informationen? Sehen Sie sich diese Seite an.
Letzte Aktualisierung: 2024-12-23 (Zahl der Positionen: 2 217 157)
© Copyright 2024 NORMSERVIS s.r.o.